First Floor Framing Day 2
They got most of the garage up today. They only lack the panels around the door and the header above the door. That should be done early tomorrow morning. All of the inside walls are framed on the first floor, with only a couple of minor changes that need to be made.
Tomorrow they are supposed to start on the second-floor floor trusses. They will hopefully finish that and be ready to put the roof on on Monday. Then the structure will be up!