House Update
Hello everybody. A lot has been happening at the house. I have spent the last several days after work installing electrical outlets. We bought a bunch of lights and ceiling fans. The tile guys are working on the shower and the back splashes. It almost feels like a house now. There are places you can stand and it looks like a finished house.
The upstairs carpet is scheduled to be installed next Tuesday. The garage door is on order, and should be installed soon. The electrical installation is underway, and shouldn't take too terribly much longer. As soon as that is done, we can have the A/C finished and let it run to climatize the hardwood floor. Once that is done, we can install the floor. Other than that, I think plumbing is the only other major thing left. It is definitely coming along.
Our lovely master bathroom cabinets
Installed kitchen sink light... and it works!
Looking into the dining room from the kitchen- Notice the back splash tile matches the border on the floor
Kitchen cabinets and back splash half installed
Master bath shower with tile, but no grout