Thursday, January 31, 2008
Wednesday, January 30, 2008
Roof, Day 3
It looks like they finished the roof today! The only thing left on the SIPS is a few pieces of end lumber and screws to hold it all together. They have rolls of felt on the roof that I assume will be going up as soon as they finish the previously mentioned minor details. It's really looking lika a house now! I guess now they finish the framing and get to the siding , roof and inside.
Front of the house- All the roof
From the inside- looking at the newly installed roof
Posted by baledochenz at 4:32 PM 0 comments
Labels: New House
Tuesday, January 29, 2008
Caleb's 7th
Happy Birthday to Caleb! We went to Olive Garden to celebrate; that's where Caleb wanted to go. We went back to Grammy and Poppa's house and opened a few presents. Saturday, we're supposed to have cake and ice cream and the other 8 yards.
Posted by baledochenz at 9:21 PM 0 comments
Roof, Day 2
They got the rest of the main house roof up, as well as the roof over the garage. Tomorrow they shouldn't have any trouble getting the roof up over the back bedrooms. Hopefully we won't get any rain.
It's really starting to take shape. It won't be long and we'll be moving in...
Front of the house- with a garage roof!
Back of the house- note the missing roof on the left
Looking into the garage door- playroom above
Posted by baledochenz at 9:10 PM 0 comments
Labels: New House
Roof, Day 1
Sorry for not posting last night, the internet was giving me trouble.
They got the back half of the main-house roof on. They probably would have got more on, but they had a little trouble with the engineer's plans, and took about two hours to figure out the right way to do it. Luckily, they figured it out and got everything going. We got there in time to see the last panel going up. I'll get some pictures of today's progress and post later. Hopefully they got quite a bit more done.
Last panel of the day going up
View from the driveway with half of the roof
Posted by baledochenz at 3:57 PM 0 comments
Labels: New House
Friday, January 25, 2008
Roof Supports
It looks like they got all of the roof supports and ridge beams up today. I suppose they will start putting up roof panels on Monday (weather permitting). Once that is completed, I guess the SIPS assembly part of construction will be complete. They can then start wrapping and putting in windows and doors and then move on the inside details.I am excited to see progress, but it sure seems like it's taking longer than it should. I guess, like everything else in life, it won't seem so long once we finish and get moved in. Ten years from now, we will hardly remember the wait.
Front of the house
Looking toward the front, top floor- Kitchen down on the right, living room down on the left
Posted by baledochenz at 5:05 PM 0 comments
Labels: New House
Thursday, January 24, 2008
Ridge Beam
Today they got up the main ridge beam that supports the center of the roof. They also got the wedge boards down that the edges of the roof are secured to. They built the wall that is part of the ridge support over the boys' bedroom section of the house. With the sunny and clear weather tomorrow, they may get some of the roof up. It would be nice if the worked hard and got all of the roof up, but it seems that in the construction industry, Friday is half day...
Looking up toward the back of the house from the kitchen
Standing in the playroom above the garage looking across the back loft to the room above the boys' bedroom- the area without floor on the right is the living room
Posted by baledochenz at 7:05 PM 0 comments
Wednesday, January 23, 2008
SIPS Gable Panels
They finished the second-floor flooring. Then they put up the gable end panels. They are supposed to frame the inside walls and get the roof support beams up tomorrow. They also said they may have a few of the roof panels up tomorrow. I believe that the goal is to have the roof on by Friday. Then next week they can put up siding and build the porch and whatever else they need to do.
Posted by baledochenz at 5:17 PM 0 comments
Labels: New House
Tuesday, January 22, 2008
Second Floor Nearly Complete
They got all of the decking up on the second floor with the exception of about 2 feet across the front of the house. We had rain again, so they didn't get it all the way finished. Tomorrow they are supposed to finish the decking and start on the gable ends. If all goes well, we might see roof tomorrow!
Front of the house with finished second floor edges- note the floor on top of the garage
Looking from the living room into the kitchen- note the bridge!
Posted by baledochenz at 6:04 PM 0 comments
Labels: New House
Monday, January 21, 2008
Finished Second-Floor Floor
No pictures today, but I spoke with the foreman this afternoon and he said the upstairs floor should be finished today. He also said that they were on track to have the house completely dried in by the end of the week. When we were there, they had most of the floor up on the back of the house. They had the bridge up. And they were starting on the stuff around the edges. I think they were going to start putting down the decking so that they could start on the gable-end panels and roof tomorrow.
Posted by baledochenz at 2:53 PM 0 comments
Labels: New House
Friday, January 18, 2008
Second-Floor Floor Framing
They got the rest of the garage up today, and they started on the second-floor floor trusses. They got all of the trusses up over the garage and the front of the house. On Monday they are supposed to finish the floor and start on the roof. There are a couple of first-floor framing details they need to correct, but so far, I am happy with the progress.
Posted by baledochenz at 8:31 PM 0 comments
Labels: New House
Thursday, January 17, 2008
First Floor Framing Day 2
They got most of the garage up today. They only lack the panels around the door and the header above the door. That should be done early tomorrow morning. All of the inside walls are framed on the first floor, with only a couple of minor changes that need to be made.
Tomorrow they are supposed to start on the second-floor floor trusses. They will hopefully finish that and be ready to put the roof on on Monday. Then the structure will be up!
Front of the house- garage on the left
Looking in- from the front door
Posted by baledochenz at 5:52 PM 0 comments
Labels: New House
Wednesday, January 16, 2008
First Floor Framing Day 1
With the rain, they didn't get a lot done today. They got the walls to the boys' bedrooms and bathroom framed. They also got the wall around the master suite framed. Then it rained for the rest of the day, and nothing else has happened.
Posted by baledochenz at 4:30 PM 0 comments
Labels: New House
Tuesday, January 15, 2008
First Floor SIPS Installation
The panels for the first floor were installed today. I believe tomorrow's plan is to frame the interior walls and get ready for the second floor trusses. It's all starting to come together. A long way to go, but it's coming along.
front of the house
Back of the house
Posted by baledochenz at 5:58 PM 0 comments
Labels: New House
Sunday, January 13, 2008
SIPS Staging
All of the panels have been moved to our site, and are ready to be assembled. They should start putting them up tomorrow, and hopefully we will have a house very soon.
Posted by baledochenz at 1:21 PM 0 comments
Labels: New House
Saturday, January 12, 2008
Report Cards
Caleb and Judah got their second quarter report cards today.
Here's Caleb's:
Reading- 95 A
Language 94 A
Spelling 97 A
Math 99 A+
Social Studies 100 A+
Science 100 A+
PE 100 A+
Here's Judah's:
Recognizes colors- E
Recognizes own name- E
Counting 1-5- E
Recognizes numbers to 10- S
Enjoys Bible stories- E
Knows his Bible verses-S
Interacts well with others- S
Controls his temper- S
Is attentive- N
Is able to follow directions- E
Handles crayons and pencils well- E
Mrs. Mason's comment: "Judah is a very smart child. We have to work on his attention span during lesson time."
Posted by baledochenz at 11:07 AM 0 comments
Friday, January 11, 2008
Finished Floor!
Well, they finished the floor, and layed out the rooms today. Apparently, they are going to work over the weekend moving panels from John's house to our house. When they finish that, John is going to teach the crew how to put up the SIPS and let them practice by putting up his garage. Then... They get to our house!
Posted by baledochenz at 7:50 PM 0 comments
Labels: New House
Thursday, January 10, 2008
More Floor
They got the first floor framing completed today and the building inspector passed it. They started putting down the decking, but didn't get it finished. They got the dining room, kitchen, laundry room/pantry, and our bathroom decking done. They should have the rest of the floor done by noon tomorrow.
Posted by baledochenz at 6:41 PM 0 comments
Labels: New House
Wednesday, January 9, 2008
Floor
After what seems like another infinite break in progress, we finally have... well, progress.
The framing crew started installing the first floor framing today. They got a bit of it completed. They should be done tomorrow(?).
Posted by baledochenz at 4:59 PM 0 comments
Labels: New House